Hemyock
Hemyock
There was a lot of damp in this building so the internal walls we stripped and lime plaster applied.
The ceiling was rotten from internal leaks so this lath and plaster were replaced. To help deal with the moisture we installed two limecrete floors. One had reconstituted slabs laid and the other had a new oak floor installed.







Previous
Next